- Home
- Technologies
- Battery storage
Battery storage
A battery that pays for itself.
A battery is not an appliance but a trading tool. It earns from when it charges and when it discharges, and that matters more than the brand of the cells. We size it and plan its operation on the revenues actually available at your site.
- ScaleFrom hundreds of kWh at a business to 150 MW on the grid
- Within CZK 1 bnHundreds of MWh of standalone storage
- ERÚ licenceStorage above 100 kW connected to the grid
- Our roleRevenues, development, supervision, performance checks
Three kinds of battery
The same containers of cells can do entirely different jobs. The job decides the size, the connection, the contracts and who controls the battery.
Behind a company's meter
Cuts consumption peaks and reserved capacity, stores surplus from your own solar and provides backup.
Beside a power plant
Shifts midday output into the evening, when power is worth more, and makes better use of the connection the plant already has.
Standalone on the grid
Trades on the electricity market and provides balancing services to the transmission system operator.
A combination
One battery can do several things at once. What matters is which revenues add up and which exclude each other.
What we do for you
- We model revenues quarter-hour by quarter-hour from your data and market prices, with cell degradation and grid charges, and show what happens if prices move.
- We set power and capacity, the connection and metering, and who will control and trade the battery.
- With partners, we handle permits, the fire-safety design and the separation distances that authorities and fire services look at ever more closely for batteries.
- We write the specification, run the tender and help negotiate supply, service, guaranteed capacity and availability.
- As owner's engineer we oversee construction, testing and acceptance, the control system and its security included.
- Once it runs, we compare what the battery earned with what it could have earned, and keep the optimiser or aggregator honest.
What to watch
- Grid-service revenues have fallen. The average price of aFRR+ reserve bought long term by ČEPS fell from EUR 20.8/MW/h in 2025 to EUR 10.8/MW/h in 2026. We therefore build the revenue model on a mix of trading and services, never on a single line.
- Banks are cautious. According to Seznam Zprávy, some Czech banks have not financed new standalone batteries since early 2026, or assess them case by case. In December 2025 Komerční banka cited at least 20 % equity and a tenor of about ten years.
- There is a queue for connection. ČEZ Distribuce received 4,414 storage connection requests totalling 47.1 GW in the first half of 2026. The order of applications is only one of the criteria, so it pays to apply at a realistic size, with a plan for carrying the non-refundable part of the connection contribution.
- The licence and the 1.2 rule. Storage above 100 kW connected to the grid needs an ERÚ licence for electricity storage. A generation licence holder may store through its plant without one if the storage's total installed power does not exceed 1.2 times the plant's installed power. Aggregation needs an electricity trading licence.
- Capacity has to be proven. The RES+ 1/2025 call required usable capacity to be proven by guarantee tests at commissioning. Even without a grant, we recommend accepting a battery on its measured capacity and efficiency.
- Tariffs from 2027. From 01/01/2027, customers at medium and high voltage will pay for their reserved input. A battery that shaves peaks lets you reduce it and save. Distributors need up to 30 days to change a connection contract.
Sources: oEnergetice, 10/06/2026, Seznam Zprávy, 01/07/2026, E15, 08/12/2025, ČEZ Distribuce, 22/07/2026, Energy Act, SFŽP, call RES+ 1/2025, ERÚ press release, 07/10/2026. As at 24/10/2026.
Other storage technologies
Lithium iron phosphate (LFP) cells are the default choice today. Where another technology makes sense, we assess it independently, including whether a bank will finance it yet.
Sodium-ion batteries
Similar uses to LFP. CATL says global commercial deliveries of its grid systems start in June 2027, and it is preparing the first large project in central and eastern Europe with Solarpro.
Flow batteries
For four to ten hours or more and deep daily cycling. In May 2026 delivery of a 20.7 MWh vanadium flow battery beside a solar plant was completed in the UK. Considerably more expensive to build than LFP.
Sand heat storage
Since June 2025, a 1 MW / 100 MWh sand battery has been the main heat source of the district heating network in Pornainen, Finland. Suited to smaller heat networks.
Molten salt for steam
Since October 2025, a 56 MWh store of salt heated above 400 °C has supplied process steam to a corn-processing plant in Hungary under a fifteen-year heat supply contract.
Hot-water tanks
Mature and inexpensive. Danish tanks installed since 2013 average about 5,000 m³; Aalborg built four of 50,000 m³ each.
Hydrogen
For seasonal storage, still at pilot stage. We assess small electrolysers of 1 to 5 MW, but in our view the business case in Czechia rarely works yet.
Compressed and liquid air, gravity
They need suitable geology or large scale. We do not consider them realistic for projects up to CZK 1 bn in Czechia today.
Flywheels and supercapacitors
Seconds to minutes, for power quality and fast response. Worthwhile as part of a hybrid system.
We do not develop pumped-storage hydro.
Sources: CnEVPost, 21/07/2026, Electrek, 11/05/2026, Polar Night Energy, 11/06/2025, Kyoto Group, 09/10/2025, Danish Energy Agency, 2026. As at 24/10/2026.
Typical projects
| Project | Usual scale | What decides it |
|---|---|---|
| Behind a business's meter | 0.1 to 10 MWh | Load profile, reserved input, tariffs from 2027 |
| At a solar or wind plant | Set by the plant's output | Shared connection, shifting output, the 1.2 rule |
| Standalone on the grid | 10 to 150 MW | Connection, licence, revenues and finance |
For a sense of scale, a few projects from the Czech market. These are not our projects.
| Project | Power and capacity | Investment and status |
|---|---|---|
| SUAS GROUP, Lipnice, Sokolov region | 57 MW / 120 MWh | CZK 400 m, launched in 2026 |
| Sev.en, Chvaletice | 115 MW / 230 MWh | Over CZK 1 bn, planned |
| Second Foundation, Vraňany, Stonava and Tušimice | 307 MW / 620 MWh in total | Over EUR 160 m, under construction or nearing launch (06/2026) |
Sources: oEnergetice, 18/08/2026, oEnergetice, 11/01/2026, Renewable Energy Industry, 03/06/2026. As at 24/10/2026.
FAQ
Batteries: your questions.
How big a battery do we need?
That depends on what it will earn from. At a business we size it from quarter-hour demand data, reserved input and tariffs; at a power plant from the output profile and the connection capacity. A bigger battery is not automatically a more profitable one.
Does a battery need a licence?
Storage above 100 kW connected to the grid does: an ERÚ licence for electricity storage. A generation licence holder may store through its plant without one if the storage's total installed power does not exceed 1.2 times the plant's installed power.
Who will operate and trade the battery?
Usually an optimiser or aggregator. You can sign an aggregation contract without your electricity supplier's consent and switch aggregator free of charge. We help you choose one and set the contract up so its performance can be measured.
Which cells do you recommend?
No particular brand: we are independent of manufacturers. LFP cells are the default today; sodium-ion may become an alternative from 2027. We compare offers on guaranteed capacity, efficiency, service and safety.
Other technologies